People, environment, equipment, procedures and organisation. Every item gets a reference the findings can cite.
Every incident, understood.
A structured, evidence-led ICAM investigation, guided step by step, with a coach inside every case.
INC-2026-0418 Night shift, transfer tower 2
Who InvestigatePro is for
I supervise a crew
Run an investigation that stands up, without a week of paperwork.
See the coach at workI run HSE for the site
One method across every case, every shift, every contractor.
How the method runsI sign the findings
Findings you can put in front of a board or a regulator.
Read a sample reportThe expertise sits in the case, not in the room.
Isolation failure during a conveyor gearbox change-out, night shift. Four things the coach did with it, and what the investigator did back.
-
INC-2026-0418 Evidence registerAdd evidenceEvidence registerCollected by PEEPO category
Ref Item Category Status E-01 Isolation certificate (permit to work) Procedures Missing E-02 Lock-point verification records, L1 to L5 Equipment 3 of 5 E-03 Padlock register, night shift Procedures Requested E-04 Scene photographs, gearbox drive Environment Attached E-05 Fitter statement People Scheduled E-06 SCADA event log, 21:00 to 23:30 Equipment Attached Evidence gap
The coach compares what should exist by now with what the case holds, and names what is missing.
EvidenceCoach: Evidence gapTwo of five lock points have no verification record, and the isolation certificate is not attached. Ask for the permit and the padlock register before the scene is released.
Investigator requested the permit and the padlock register -
INC-2026-0418 WitnessesAdd witnessWitness interviewsPlanned for the next 24 hoursFitter Interview 06:40, before handoverWalk me through the change-out from the moment the drive stopped.At what point did you believe the drive was dead, and what told you so?Night-shift supervisor Interview 07:15How was the isolation handed over at the start of the job?Control-room operator Interview 07:40What did the conveyor show on your screen at 21:10?
Witness prompt
It drafts the question that opens a witness up, for the interview that is about to run.
WitnessesCoach: Witness promptAsk the fitter: at what point did you believe the drive was dead, and what told you so?
Added to the fitter’s interview plan -
INC-2026-0418 ICAM AnalysisAI SuggestICAM AnalysisCoverage across the four levelsIndividual1 factor(s)Work began after a local stop, before isolation was tested.Task/Environment1 factor(s)Night shift, reduced crew, lock points on two levels.Organisation0 factor(s)No organisational factors yetDefences2 factor(s)No test-for-dead step at the drive.Certificate missing; 2 of 5 lock points unverified.INC-2025-1107 · handover step INC-2026-0122 · handover step
Unexamined ICAM level
It flags a level left empty and points to earlier events on the same line.
ICAM levelsCoach: Unexamined ICAM levelOrganisational factors are still empty. Two earlier isolation events on this line cite the same handover step.
Investigator opened both linked events -
INC-2026-0418 ICAM Analysis Suggested factorsAI-Suggested ICAM FactorsAnalysis complete: 1 factor, 0 gapsIsolation verification relied on one person’s check, with no independent confirmation required on night shift.Reasoning: the lock-point records carry one signature each, and both earlier events cite the same handover step.Accept Edit RejectThe report lists this factor under the lead investigator’s name, with its sources.
Suggested factor
It drafts a factor with its reasoning and sources. The investigator accepts, edits or rejects it.
You decideCoach: Suggested factor, organisationalIsolation verification relied on one person’s check, with no independent confirmation required on night shift.
Accepted by the lead investigator
From guesswork to evidence.
The method has never been the problem. What changes is that every finding is held to something, and the guidance no longer depends on who is in the room.
Conclusions formed before the evidence is in.
Every factor tied to the evidence that supports it.
Depth that depends on which specialist is free that week.
The same guided method for every investigator, every case.
Organisational factors quietly skipped when time runs short.
All four ICAM levels prompted, so nothing is left empty by accident.
A method that lives in a manual, not in the work.
The method running alongside you as the case is built.
From first notification to a report you can sign.
One method carried through the whole case. Sample data from INC-2026-0418.
Read from the organisation down to the event. Each level is prompted on every case, so an empty one is a finding, not an oversight.
Times and sources on one line, so the gaps in the story show before the analysis starts.
Each corrective action sits on the hierarchy, so a retraining-only fix is visible for what it is.
An action reaches verified when someone checks the control works. Owner and due date stay on the record.
One click renders the full investigation report, attributed to the lead investigator, as PDF or PPTX.
The report is the case, formatted.
A report generated in the demo workspace: INC-2026-0001, a conveyor guard left off after a belt change. Fifteen pages, each cause traced to the evidence behind it.




A proven method. A new pace.
Reason’s model of organisational accidents: failures line up through the layers before anyone gets hurt.
ICAM formalises it for heavy industry: individual and team actions, task and environmental conditions, organisational factors, and absent or failed defences.
Decades of investigation practice, at the fingertips of whoever is running this one.
The coach carries what a seasoned ICAM lead would ask: the evidence that should exist by now, the question that opens a witness up, the organisational factor that has already appeared twice on this line. It prompts the next step on every investigation, not only the ones a specialist can attend.
Every investigation starts on someone’s clock.
The method holds on every case. The deadline depends on where the case happened, and the first one can be fifteen minutes.
- United States, minesNotify MSHA of an accident, by phone, within 15 minutes of knowing about it.30 CFR 50.1015 min
- United States, OSHAReport a work-related fatality.29 CFR 1904.398 hours
- United States, OSHAReport an in-patient hospitalisation, an amputation or the loss of an eye.29 CFR 1904.3924 hours
- Canada, British ColumbiaComplete the preliminary investigation and its report.Workers Compensation Act s.7148 hours
- United States, OSHARecord the incident on Form 301.29 CFR 1904.297 days
- South AfricaReport the accident to the Compensation Fund on form W.Cl.2.COIDA7 days
- South Africa, minesBegin the investigation of a reportable accident.MHSA s11(5)10 days
- United States, minesFile the accident, injury and illness report on form 7000-1.30 CFR 50.2010 working days
- United KingdomReport an over-seven-day injury to a worker.RIDDOR 201315 days
- Canada, British ColumbiaComplete the full investigation and its report.Workers Compensation Act s.7230 days
Duties as written in each regulation, checked September 2026. Your site’s obligations depend on the event and the jurisdiction.
Built by someone who has run the investigations.
Devon Turner led safety across Africa and the Middle East for one of the world’s largest gold producers, with an ICAM specialism. InvestigatePro is the way he wanted every investigation run: evidence first, all four levels examined, and nobody blamed for a gap in the system.
- Experience
- 15+ years leading mining safety
- Regions
- Africa and the Middle East
- Method
- ICAM specialist
Free tools for real investigations.
Templates, worksheets and working tools from frontline ICAM practice. No account needed.
The 25-point ICAM checklist
From the first thirty minutes to close-out. Tick items off as you go; your progress stays in your browser.
Open the checklistRun the next investigation with the method built in.
Start a self-serve 14-day trial on Starter or Professional, and run your next case with the coach.
Running several sites?
Business and Enterprise start with a guided pilot on your own cases. Leave three details and Devon calls within one working day.