Incident investigation built for engineering projects.

Principal contractors, specialists and client staff on one site, often in more than one country. Every investigation runs through ICAM, so a coordination failure is found, not filed as operator error.

The clocks on an engineering project

  1. United States, OSHAReport a work-related fatality.29 CFR 1904.39
    8 hours
  2. United States, OSHAReport an in-patient hospitalisation, an amputation or the loss of an eye.29 CFR 1904.39
    24 hours
  3. Canada, British ColumbiaComplete the preliminary investigation and its report.Workers Compensation Act s.71
    48 hours
  4. South AfricaReport the accident to the Compensation Fund on form W.Cl.2.COIDA
    7 days
  5. United KingdomReport an over-seven-day injury to a worker.RIDDOR 2013
    15 days
  6. Canada, British ColumbiaComplete the full investigation and its report.Workers Compensation Act s.72
    30 days

Built for the events that matter on a project.

The method is the same on every case. What the investigation has to look at depends on the hazard.

Engineering hazards, the events they produce, and where the investigation reaches
HazardThe eventsWhere the analysis reaches
Falls from heightA leading cause of fatal injuries on construction and engineering sites.Fall-protection design, inspection, permit-to-work quality and supervision.
Cranes and liftingDropped loads, rigging failures and crane collisions.Lift planning, rigger competency, exclusion zones and equipment inspection.
Excavation and ground collapseTrench collapse, ground instability and buried-service strikes.Ground investigation, shoring selection, permit to dig and supervision.
Electrical and utility strikesLive cables, gas mains and pressurised services.Service detection, permits, subcontractor supervision and planning.
Struck-by and vehicle incidentsPedestrian and plant interaction, road-project traffic.Traffic management plans, segregation and contractor interfaces.
Structural and temporary worksFormwork collapse and failures during construction phases.Design review, temporary-works sign-off and inspection.
Hot work and fireWelding, cutting and hot work on site.Hot-work permits, fire watch, isolation and combustible material.
Confined spaces and atmospheresTunnels, chambers and process vessels.Atmosphere monitoring, rescue provision, permits and the decision to enter.

One investigation, end to end.

  1. Log the event

    Classification, location in your site structure, people involved and the first description.

  2. Build the timeline

    Photos, statements and documents attached to the sequence of events. The coach flags gaps.

  3. Analyse with ICAM

    Absent or failed defences, individual or team actions, task or environmental conditions, organisational factors.

  4. Generate the report

    Evidence, timeline, causal analysis and recommendations in one formatted document.

  5. Take actions to verified

    Owners and due dates stay visible until each action is checked and verified.

It sits alongside your system of record.

Keep the EHS platform your site already runs. InvestigatePro is where the investigation gets done properly, and its output feeds that platform.

InvestigatePro

The investigation: evidence, the four ICAM levels, the coach, actions and the signed report.

Report and actions

Your EHS platform

The incident register, compliance records and everything else it already holds.