Incident investigation built for manufacturing operations.

The same injury on a different line, two months later. Every investigation runs through ICAM, so the analysis stops at the system that made the event likely, not at the person on the shift.

The clocks on a manufacturing site

  1. United States, OSHAReport a work-related fatality.29 CFR 1904.39
    8 hours
  2. United States, OSHAReport an in-patient hospitalisation, an amputation or the loss of an eye.29 CFR 1904.39
    24 hours
  3. United States, OSHARecord the incident on Form 301.29 CFR 1904.29
    7 days
  4. South AfricaReport the accident to the Compensation Fund on form W.Cl.2.COIDA
    7 days
  5. United KingdomReport an over-seven-day injury to a worker.RIDDOR 2013
    15 days

Built for the hazards on a plant floor.

The method is the same on every case. What the investigation has to look at depends on the hazard.

Manufacturing hazards, the events they produce, and where the investigation reaches
HazardThe eventsWhere the analysis reaches
Cuts, lacerations and amputationsContact with blades, edges and moving parts.Guarding, maintenance bypass practice, work instructions and line-speed pressure.
Machine guarding and entanglementNip points, rotating equipment and point-of-operation contact.Guard design, maintenance of protective systems and bypass habits on the line.
Lockout and isolationStored energy released during maintenance or servicing.Isolation procedures, verification steps, supervision and training.
Musculoskeletal injuriesFrequent, and often under-investigated.Task design, rotation, rate targets and the pressure that skips rest.
Slips, trips and fallsHousekeeping, floor contamination and work at height.Housekeeping systems, spill response, footwear standards and inspection.
Forklifts and material handlingPedestrian strikes, tip-overs and dropped loads.Traffic management, operator competency, pre-shift checks and layout.
Chemical and thermal burnsChemical exposure, steam and molten material.Chemical management, PPE selection, exposure monitoring and hot-task instructions.
Electrical safetyArc flash, contact and shock.Electrical safety programmes, arc-flash assessment and permits to work.

One investigation, end to end.

  1. Log the event

    Classification, location in your site structure, people involved and the first description.

  2. Build the timeline

    Photos, statements and documents attached to the sequence of events. The coach flags gaps.

  3. Analyse with ICAM

    Absent or failed defences, individual or team actions, task or environmental conditions, organisational factors.

  4. Generate the report

    Evidence, timeline, causal analysis and recommendations in one formatted document.

  5. Take actions to verified

    Owners and due dates stay visible until each action is checked and verified.

It sits alongside your system of record.

Keep the EHS platform your site already runs. InvestigatePro is where the investigation gets done properly, and its output feeds that platform.

InvestigatePro

The investigation: evidence, the four ICAM levels, the coach, actions and the signed report.

Report and actions

Your EHS platform

The incident register, compliance records and everything else it already holds.

Run your next plant investigation with the method built in.

Start a self-serve 14-day trial, or bring a recent incident to a 15-minute demo.